Controlled Burn Out Of Control |
March 13, 2009 |
Station 21 Equipment: |
Engine 21 Tanker 21 Utility 21 |
Engine 22-1 Engine 22-2 Tanker 22 Ambulance 23-1 Engine 23 Tanker 26 Engine 34 Tanker 34 Engine 35-1 Engine 35-2 Tanker 35 Attack 36 Brush 37 Engine 37-1 Tanker 37 Brush 38 Engine 38 Tanker 38 Ambulance 39-1 Tanker 39 Ambulance 41-3 Engine 41 Rescue 41-1 Ambulance 42-1 Ambulance 42-3 Attack 42 Engine 43 Brush 44 Engine 44-1 Tanker 44 Engine 54-2 Truck 89-1 LC Tanker 7-8 LC Engine 7-9-2 LC Rescue 7-9 LC Tanker 7-9 LC Engine 8-1-1 |
Mutual Aid Equipment: |
At 12:33, 21 Volunteers were dispatched to a brush fire next to a structure at 4339
Pleasant Valley Road, bringing a full structure response. Engine 21 responded
within minutes with the Tanker close behind. Engine arrived to a
50x100 section of hillside and woods on fire, spreading quickly due to strong winds.
A line was pulled to protect the structure and start a perimeter to
control the fire. Crews made their up the hillside to view the extent of
the fire. During the time, other crews accessed the fire from the north,
off of Binder Drive. After the fire was controlled on the south side, a
supply line was established to help with suppression on the upper end. With
this, crews made good progress on the fire and it was marked under control.
Two large, hollow trees were cut down to extinguish fire inside. This
fire was caused by a burn barrel. Thank you to all of the support from
mutual aid companies. |
Station 21 Personnel: |
Asst. Chief Rudisill Captain Tracey Lt. Tracey FF Craley FF/EMT Edmister FF/EMT Enochs FF Stillinger FF Stough FP Captain Fisher FP Lt. Dietz FP Beaston |